Selective packer for multizone fracturing


  • SureStraddle selective fracturing system for cemented and non-cemented  completions
  • Fracturing in wells with existing perforations
  • Run in hole and operations during hydraulic fracturing are carried out on the tubing or coiled tubing
  • There is no restriction on the length of the interval – the distance between the packer elements is set by frac cups
  • Possibility of using for repeated fracturing in wells equipped with frac sleeves, prepared for full-size wellbore (milling, retrieval or dissolution of ball – landing seats)